Home > News > World >

China-Laos railway tunnel completed
By:Xinhua
update:September 14,2020
KUNMING, Sept. 14, 2020 -- The cross-border tunnel on the China-Laos Railway was completed on Sunday, according to local authorities.
 
The "friendship tunnel," with a total length of 9.59 km, measures 7.17 km on the Chinese side and 2.42 km on the Lao section.
 
The building of the tunnel is a significant step forward in the construction of the China-Laos Railway, said Liu Juncheng of China Railway Kunming Group Co. Ltd., one of the builders of the railway.
 
Construction has been completed on some 97.5 percent of the designed tunnels on the Yuxi-Mohan section, in the Chinese part of the railway. Track-laying and construction of station are proceeding as planned, Liu added.
 
Using China's technical standards and equipment, the China-Laos Railway stretches more than 1,000 kilometers from Kunming, capital of southwest China's Yunnan Province, to Vientiane, capital of Laos. The project is scheduled to be completed and opened to traffic at the end of 2021.
 
The railway is seen as a strategic docking project between the China-proposed Belt and Road Initiative and Laos' strategy to transform from a landlocked country to a land-linked hub. The railway will slash the travel time between Kunming and Vientiane to half a day.
 
  • Aerial view of farmland in Lhasa river valley of Tibet
  • Local farmers busy in fields in harvest season of highland barley in Tibet
  • Xi sets policy directions for developing Tibet

E-mail:editor@tibetol.cn |About Us|Contact Us |Site Maps|
Address:3/F, C Tower, RECREO International Centre, 8 Wangjing East Road, Chaoyang District, Beijing 100102, PRC
Tel:13651236230
Copyright by China Intercontinental Communication Co., Ltd All Rights Reserved.